Breakdown now? Call +971 50 255 3609 or WhatsApp us a photo of the controller display. It tells us what to bring.
What to do while you wait
- Keep the doors shut.A closed room holds temperature far longer than one that is being opened to check on it.
- Check the simple things.Is there power to the condensing unit and the controller? Has a breaker tripped? Is the controller showing an alarm? Do not open electrical panels.
- Do not keep resetting a compressor that trips.Repeated restarts can turn a small fault into a failed compressor.
- Move critical stockif the temperature is still rising and you have somewhere cold to put it.
- Send us a photoof the controller display and any alarm codes on WhatsApp, so the engineer arrives with the right parts.
Faults we fix
- Room not holding temperature, or drifting in the afternoon
- Compressor tripping on high pressure or overload
- Evaporators icing up, or defrost not clearing
- Water leaking from evaporator drains
- Torn door seals, icing frames and doors that drag
- Controller, sensor and alarm faults
- Refrigerant leaks
- Condenser fan and motor failures

Parts
Replacement compressors, fans, controllers, valves, door seals, heaters and panels for cold rooms, refrigeration and HVAC, including systems we did not install.
Fix it once
A repair is a good moment to ask why it failed. If the plant is undersized for Gulf ambient, the floor is heaving or the joints are icing, we will tell you, and price putting it right properly. Refurbish or replace?
Stop it happening again
Many breakdowns start as something a planned visit would have caught: a blocked coil, a worn seal, a drifting controller. A maintenance contract puts your response time in writing and keeps the plant from getting to that point.
Questions we are often asked
Do you repair systems you did not install?
Yes. We repair cold rooms, refrigeration and HVAC whoever installed them.
Can you come today?
Call or WhatsApp us and we will tell you when an engineer can attend. Customers on a maintenance contract get the response time agreed in their SLA.


